760 Washington Avenue | Carlstadt, NJ
Mission Critical Data Center Facility is a 172,000 SF property that was developed in 2003 with 36’ ceiling height, 5MW utility capacity, and heavy floor loads located just 7 miles from the George Washington Bridge and Lincoln Tunnel.